Rates are based on the charging duration or kWh or a combination of both depending on the charging station. Time-based charges are charged by blocks similar to parking.
Time-based charges
Since time-based charges are charged by blocks, whenever you enter a new block it will be rounded up and calculated into your cost.
Example
Total charging time | Total charging cost |
5 minutes | RM 0.10 x 5 minutes = RM 0.50 |
5 minutes 11 seconds (6 minutes) | RM 0.10 x 6 minutes = RM 0.60 |
RM 0.10/min is the rate for the Suria KLCC charger. The additional charge of RM0.10 in the second row is because the rate is calculated at the start of the minute (1 block is 1 minute). Since each block is a minute, even if it is 1 second after the minute, it will be considered a new block and you will be charged for the additional minute.
Energy-based charges
Example
Total energy charged | Total charging cost |
65.055 kWh |
RM 1.50 x 65.055 kWh = RM 97.58 (rounded down from RM 97.5825) |
24.619 kWh |
RM 1.50 x 24.619 kWh = RM 36.93 (rounded up from RM 36.9285) |
RM 1.50/kWh is the rate for XPark Sunway Serene charger. The final value will be rounded up or down based on the final calculation.
Combined charges
For a combination of both time and energy charges, the calculation is the same. The final value of both charges will be calculated and combined to get the total charging cost.